RZR XP Cage Build - March 3, 2012
Index 1
Index 2
Index 3
Index 4
Index 5
of 5
31. Perfect.
32. Looks great.
33. Notice the bend in the roof has been fixed.
34. Matt makes some mounts for the rear.
35. Figuring it out.
36. Checking the spacing.
37. The front mount on one side is tacked in place.
38. The other side is done.
39. It was interesting getting the rear's tacked in.
40. Matt welding it all up.
41. The rears are welded in.
42. Ok..time to disassemble.
43. Off she comes.
44. Hopefully the last time it's off.
45. It's back.
Generated with Arles Image Web Page Creator